You are here
Home | News Feed | AAL Delivers Giant Carousel for Formosa 2

AAL Delivers Giant Carousel for Formosa 2

AAL Shipping recently transported a giant cable carousel with a circumference of 73M from Dubai to Taiwan for the Formosa 2 OWF project.

Breakbulk and project heavy-lift carrier, AAL Shipping has delivered a cable carousel measuring 23 m in diameter (73 m circumference) to Jan De Nul Group, for the Formosa 2 offshore wind farm project, 9.5 km off the coast of north-west Taiwan.

The cargo was loaded in Jebel Ali and transported on deck of the 19,000 dwt heavy lift (HL) multipurpose vessel AAL Nanjing to the project marshalling port Taichung, Taiwan.

The cable carousel is one of the first major components to be delivered to Taichung Port where works have begun to develop the project’s operations and maintenance base.

The Formosa 2 project started construction at the end of 2019 and the project will be in operation in 2021.

The offshore wind farm is expected to produce enough green energy to power 380,000 households a year and offset 18.75 million mt of carbon emissions in its lifetime.

Yahaya Sanusi, Deputy Head of AAL Transport Engineering, commented, “Manufactured in Norway’s Drammen Yard and designed to spool 3,000 t of undersea power cable, the carousel alone weighed over 370 t.

The unit was loaded and discharged using both of the Nanjing’s port-mounted HL cranes and rigged in three points to a 22.5 m lifting beam (with a safe working load of 637 t), which proved to be the safest solution for the lift.”

Print Friendly, PDF & Email

“Disclaimer: “Breakbulk News & Media BV (Breakbulk.News) assumes no responsibility or liability for any errors or omissions in the content of articles published. The information and or article contained in these articles is provided on an “as is” basis with no guarantees of completeness, accuracy, usefulness or timeliness…”

blank
blank
blank
blank
blank
Top