F.H. Bertling Logistic’s team in Malaysia recently arranged for the shipment of two pressure vessel tanks for an FPSO from FCA Kuantan Port to DAP Singapore.

The tanks weighed about 60 tonnes each and were successfully transported by using drop deck trailers to reduce the total height.

The FPSO is still under construction. It is expected to commence operations in 2022 and will produce up to 220,000 barrels of oil per day.

Leave a Reply

eight − 4 =