You are here
Home | Logistics | Cranes | Blue Water Shipping completes stevedoring operation using a new crane

Blue Water Shipping completes stevedoring operation using a new crane

Blue Water Shipping carries out stevedoring operations at the Port Esbjerg. The port recently received a new crane It’s been some weeks since the crane with a maximum lifting capacity of 308 tonnes arrived in Esbjerg.

Blue Water’s stevedore department carried out the first operation with a unit containing a measuring instrument weighting 82 tonnes. The unit was loaded on the M.V. Bora Bay and is now on its way to Norway.

Print Friendly, PDF & Email

“Disclaimer: “Breakbulk News & Media BV (Breakbulk.News) assumes no responsibility or liability for any errors or omissions in the content of articles published. The information and or article contained in these articles is provided on an “as is” basis with no guarantees of completeness, accuracy, usefulness or timeliness…”

blank
blank
blank
blank
blank
Top