deugro, in collaboration with dteq Transport Engineering
Solutions (dteq), successfully delivered eight pin piles from Bilbao, Spain to Vlissingen,
Netherlands as part of the Baltic Eagle offshore wind farm project. The
77-meter-long pin piles, with a weight of over 270 metric tons each and a diameter of
2.4 meters, are the largest piles ever manufactured by Haizea Bilbao.

Print Friendly, PDF & Email
blank
blank
blank
blank

Leave a Reply