You are here
Home | News Feed | Heerema Wins Ichthys LNG T&I Contract

Heerema Wins Ichthys LNG T&I Contract

Heerema Marine Contractors is INPEX’s contractor of choice for the transport and installation of the 4,800 metric tonne Ichthys LNG Booster Compression Module (BCM).

The module will be installed on the Ichthys Explorer Central Processing Facility, located off the northwest coast of Western Australia, as part of the Ichthys LNG phase 2 development.

Heerema will transport the BCM from the fabrication yard on Batam Island in Indonesia to the Ichthys Field before installing it in a single lift. The module will be used to extend the production plateau of the field.

Heerema will be utilising Sleipnir for both the transport and installation of the module. The vessel has a wide-range of sustainability measures, including the use of emission-reducing LNG, which means the vessel produces 90% less NOx, 99% less SOx, and 25% less CO2 compared to running on Marine Gas Oil.

The vessel has a 20,000 metric tonne lifting capacity; therefore, it is possible to optimise the BCM’s design due to the vessel’s ability to install the structure in a single lift. This action reduces the time required for platform shutdown, offshore installation, and hook-up duration. This way efficiency is increased and project risk is minimised.

Print Friendly, PDF & Email

“Disclaimer: “Breakbulk News & Media BV (Breakbulk.News) assumes no responsibility or liability for any errors or omissions in the content of articles published. The information and or article contained in these articles is provided on an “as is” basis with no guarantees of completeness, accuracy, usefulness or timeliness…”

blank
blank
blank
blank
blank
Top