Estimated reading time: 1 minute
Mammoet recently assisted Dieseko Group BV with the transport of GIANT 2000 Upending Vibro. This vibrating block will be used in the future to install the large foundation piles for offshore wind turbines safely and quieter. This is an important next step in contributing to a sustainable future. After 12 months of construction, the vibrating block was ready to leave the factory and was safely transported to its next (temporary) location with the help of their SPMTs.





