You are here
Home | News Feed | Allelys Triumphs with Complex Lifting Operation at Energy from Waste Site

Allelys Triumphs with Complex Lifting Operation at Energy from Waste Site

Allelys has successfully executed a complex lifting operation at an energy from waste site just before the Easter break. This achievement underscores Allelys technical expertise meeting project deadlines and minimizing disruptions.

The task at hand involved the meticulous lifting of an 84-tonne generator and a 121-tonne turbine onto a high-level plinth, a feat that required precision and ingenuity. Leveraging their cutting-edge equipment, particularly the LG1550, Allelys seamlessly executed the operation, ensuring the timely delivery of the project while mitigating any potential site disturbances.

blank

The location of this impressive endeavor was in the Midlands, UK. Reflecting on this achievement, Allelys emphasized the importance of their adaptable approach in tackling the challenges posed by dynamic project environments.

Print Friendly, PDF & Email

“Disclaimer: “Breakbulk News & Media BV (Breakbulk.News) assumes no responsibility or liability for any errors or omissions in the content of articles published. The information and or article contained in these articles is provided on an “as is” basis with no guarantees of completeness, accuracy, usefulness or timeliness…”

blank
blank
blank
blank
blank
Top