DAKO Worldwide Transport successfully secured a contract to organize an urgent replacement shipment for the Tripoli South Gas Turbine Power Plant. With a proven track record, DAKO swiftly took charge of the task.
The critical gas turbine was efficiently loaded in Sweden and carefully transported through the strategic port of Antwerp, en route to its final destination at Tripoli Port. Leveraging their extensive experience in managing logistics for the Libyan market, DAKO executed the transportation with meticulous attention to detail and utmost professionalism.
With their comprehensive knowledge of international shipping and a deep understanding of the challenges associated with time-sensitive projects, DAKO Worldwide Transport effectively facilitated the seamless delivery of the replacement gas turbine to support the power plant’s uninterrupted operations.