Image van Oort
Van Oort starts cable installation at Iberdrola’s Baltic Eagle offshore wind farm Rotterdam, The Netherlands, 4 October 2023 - After Van Oord’s
The coastal areas of the Netherlands, particularly in the province of Zeeland, face an ongoing battle against erosion caused by currents, waves, and wind. Van
Electrification of heavy-duty earthmoving equipment brings challenges. Will an electric drive train provide the superior power needed to operate heavy-duty equipment? Where do you charge
Van Oord has been appointed as preferred supplier for the transport and installation of foundations for the 1.6 GW Nordseecluster wind project in Germany, a joint
Van Oord’s heavy-lift installation vessel Svanen has installed the first of 50 monopiles for the Baltic Eagle offshore wind farm. In addition to the transport
The M.V. Nexus was spotted during its cable-laying operation at Crosswind’s Hollands Kust Noord offshore wind farm last week. The vessel is installing the inter
Van Oord celebrated the christening of brand new trailing suction hopper dredger M.V. Vox Apolonia. The M.V. Vox Apolonia is Van Oord’s second hopper dredger
The Port of Rotterdam Authority awarded the project to the construction consortium of HOCHTIEF, Ballast Nedam and Van Oord, after going through a European tendering