You are here
Home | News Feed | Manora Busy with Offshore Wind Logistics

Manora Busy with Offshore Wind Logistics

The Manora Logistics team have been busy with the transportation of piles from Sevilla to Vlissingen for the Courseulles-Sur-Mer Offshore Windfarm. Four units each weighing 179 tonnes were shipped and the Manora team also coordinated the grillages, seafastening, transport and offloading in Vlissingen.

The team also recently transported three monopile sections from Germany to the US. Each section had a length between 20 and 27 metres, a diameter of 8,1 metres and weighed between 292 and 322 tonnes. Manora was in charge of design of grillages and seafastening, and transport to the USA.

“Great cooperation with BBC Chartering Offshore division and TWD.” Manora Logistics

blank
Print Friendly, PDF & Email

“Disclaimer: “Breakbulk News & Media BV (Breakbulk.News) assumes no responsibility or liability for any errors or omissions in the content of articles published. The information and or article contained in these articles is provided on an “as is” basis with no guarantees of completeness, accuracy, usefulness or timeliness…”

blank
blank
blank
blank
blank
Top