Images: Wagenborg
Wagenborg Nedlift’s lifting specialists have accomplished the successful installation of a new bridge section on the B226 highway in Wetter an der Ruhr, Germany. This remarkable achievement comes after the removal of the old bridge sections, highlighting the team’s expertise in handling complex projects.
What sets this installation apart from the ordinary is not just the weight but the intricate shape of the bridge section. The unique design of the structure presented a formidable challenge for the bridge installation team. It required a meticulous approach to ensure a perfect fit.
One of the primary challenges faced during this operation was the varying heights of the anchor points due to the bridge section’s special shape. To tackle this, the team employed a highly sophisticated combination of lifting straps, chains, and chain hoists. This ingenious approach allowed them to maneuver and position the bridge section with utmost precision onto the anchor points.
The success of this project is a testament to the exceptional skill and dedication of Nedlift’s operators on site. Their unwavering commitment to safety and precision ensured the project’s smooth execution. Moreover, this achievement also highlights the exemplary teamwork and cooperation between Nedlift and their valued customer.
This installation not only demonstrates Wagenborg Nedlift’s expertise in handling challenging bridge projects but also reaffirms their reputation as a reliable partner for complex logistics and heavy lifting tasks. As they continue to push the boundaries of what can be achieved in the world of maritime, breakbulk, project cargo, and logistics, the industry can look forward to more remarkable feats from this accomplished team.
In an industry where precision is paramount, Wagenborg Nedlift has once again proven their mettle, turning a challenging task into a resounding success.