Van Oord’s heavy-lift installation vessel Svanen has installed the first of 50 monopiles for the Baltic Eagle offshore wind farm. In addition to the transport
SAL Heavy Lift completed a complex shipment for AsstrA-Associated Traffic AG, involving the transportation of a large wash tower and three deaerator tanks from two
Two renowned heavy lift champions were spotted at the Maasvlakte in Rotterdam, as DEME's offshore installation vessel M.V. Sea Installer underwent preparations for the next
Blue Water Shipping carries out stevedoring operations at the Port Esbjerg. The port recently received a new crane It’s been some weeks since the crane
Mammoet supports the evolution in energy transition by completing the installation of the Vestas' EnVentus wind turbine in Australia for the Kaban Green Power Hub,
KWH Logistics subsidiary Oy Blomberg Stevedoring Ab has acquired a heavy Liebherr LHM 600 harbour crane for the Port of Vaskiluoto in Vaasa. The manufacturer of the